Páginas filhas
  • Smart View - Provision and Execution of Depreciation

CONTENTS

01. OVERVIEW

The purpose of this report is to display the Provision and Execution of Depreciation.

Important

For this report to work, follow the documentation below to configure Smart View in your environment: Smart View - Configuration of the Protheus product integrated with Smart View.


Testing Phase

This feature is on a test phase with pilot customers, being officially introduced in Release 12.1.2310.

This page and the feature may undergo changes until the date of feature release.

02. EXAMPLE

Contextualization

Report:


Data View:


Dynamic Table


Important

We must emphasize that it is up to the customer to optimally organize the dynamic table as needed and following the rule desired, in accordance with fields provided in the schema and parameter settings.


Parameters:

Question

Description

Activated in business object

MV_PAR01

Reference Date?

Yes

MV_PAR02

From Project?

Yes

MV_PAR03

To Project?

Yes

MV_PAR04

Regarding Revision?

Yes

MV_PAR05

Revision?

Yes

MV_PAR06

Depreciation Type?

Yes

MV_PAR07

Balance Type ?

Yes

MV_PAR08

Select Branches?

No

MV_PAR09

Total by Project?

Yes

MV_PAR10

Total by Branch?

Yes

MV_PAR11

Select Asset Classification?

No

Important

Parameters set to No in the list above are hidden in the report or Smart View design. These parameters neither affect the report nor its objects (Data View, Design and Dynamic Table).

Selection of Branches and Header in the Design

The features below are improvements to Smart View evolution, advising the directives below


  • Framework offers the Branch Selection parameter as an improvement in Smart View, implemented in all modules that use this feature in their reports.



  • The branch description on the report header is an improvement to the Smart View design that is expected to be released in upcoming continuous dispatches.



These evolutions will be available in upcoming continuous dispatches, in accordance with the calendar and the release schedule.

For further information, refer to the link below.

Update Packages - Fixed Assets

03. BUSINESS OBJECT FIELDS

Name Displayed

Description

Origin

Code

Code of Project

FNB_CODPRJ

Description

Project Description

FNB_DESC

Closing Dt

Closing Date

FNB_DTENCR

Revision Dt

Revision Date

FNB_DTREV

Branch

Branch of Record

FNB_FILIAL

Revision

Project Revision

FNB_REVIS

Prov Start

Provision Start Date

FND_DTPROV

Stage

Project Stage

FND_ETAPA

Item

Stage Item

FND_ITEM

Calc Index

Depreciation Index Code

FNE_CODIND

Depr Per

Depreciation Periods

FNE_PERDEP

Estimated Prd

Estimated Production

FNE_PRDEST

Depr Rate

Annual Depreciation Rate

FNE_TAXA

ATF Type

Type of Asset

FNE_TPATF

Deprec Type

Depreciation Method

FNE_TPDEPR

Balance Type

Balance Type

FNE_TPSALD

Max Dep Val

Maximum Depreciation Value

FNE_VLMXDP

Salvage V

Salvage Value

FNE_VLSALV

Original Val

Original Value of Item

FNE_VORIG

Accr Dep Val

Accrued Depreciation Value of Item

FNE_VRDACM

Month/Year

Month and Year of Entry

System

Balance

Balance Value

System

APV Ori Val

Original Value of APV Item

System

APV Accr Dep

Accrued Depreciation Value of APV Item

System

APV Balance

APV Balance Value

System

Orig Total

Original Total Value

System

Dep Total

Depreciation Total Value

System

Total Balance

Total Value of Balance

System (Balance+APV Balance)

Company Name

Logged Company Name

System

Branch Name

Logged Branch Name

System

04. ACCESS TO THE OBJECT VIA PROTHEUS MENU

You can run the Provision and Execution of Depreciation business object through the Protheus menu using the ATFSV027 program.

05. TABLES

  • FNB - Fixed Asset Projects
  • FND - Project Stage Items
  • FNE - CTB config of ATF projects